Revamping in 3–5 days. What if it isn't necessary to shut down the plant?

Revamping in 3–5 days. What if it isn't necessary to shut down the plant?

Many Tissue machines in production today share the same control architecture: one engineering station and 2-3 operator stations on PCS 7. It's the most common configuration in the sector (about 90% of plants), and also the one where the technology deadline is becoming most concrete.

We have in fact reached PCS 7 V10, the last supported version before PCS Neo definitively takes its place. For those still running older systems, this is the last window for a "simple" revamp, before the move becomes a mandatory migration to the new platform.

On top of this comes the NIS2 directive: obsolete plants now also represent a cyber risk that has to be factored in.

Our solution:
SADAS has developed a modular revamping path designed specifically for these standard architectures:

✓ On-site intervention in just 3-5 days
✓ No changes to the machine program: zero impact on the process
✓ NIS2 compliance
✓ Step-by-step path, scalable to the plant's needs

All of this is made possible by pre-validated templates, standard libraries and accelerated FAT/SAT activities, to keep downtime to a minimum.

Find us at MIAC 2026 (Lucca, October 7-9), Stand B111: let's talk, and we can also evaluate the move to the new PCS Neo platform.

You might be interested in

SADAS & ITALIMPIANTI: Safety and Continuity for the New Facility.

Read article

SADAS & ITALIMPIANTI: Safety and Continuity for the New Facility.
Variflex paper voith rewinder

Read article

Variflex paper voith rewinder

View allView all

Progetto S-Invest per incrementare processo produttivo e servizi offerti ai clienti. Importo investimento € 200.000,00. Importo contributo concesso:€ 81.300,00